Discharge routes

2023-11-21

Picture showing discharge routes

During the autumn of 2023, we have worked on opening up discharge routes to get large and heavy equipment out:

  • In building 5, four floors down in the Uttagslaboratoriet-Ulabb, we have demolished partition walls made of plaster and concrete to get a transport route out of the cyclotron hall to the lift and lift shaft.
  • In building 17, three floors down, we have demolished partition walls made of plaster, concrete and iron to get a transport route out of the therapy space and the beam path to lifts and lift shafts.
  • In building 17, we have since before had a way out of the Blue hall and Gamma cave via lift shaft and elevator.